Projects - Design and Construction Supervision of Main Water Pipeline

Project Description

335014_GUSCOlaemLOCATION 
Lam Chabang Industrial Estate, Sri Racha District, Chonburi Province

CLIENT
Global Utilities Services Co., Ltd.

DESCRIPTION
Laem Chabang Industrial Estate has been operational and expanding since 1982, increasing the demand for water supply. The industrial estate covers a total area of 3,556 rais (569 hectares) and is divided into 3 zones, namely:
General Industrial Zone: 1,824 rais (292 hectares)
Industrial Export Zone: 979 rais (157 hectares)
Infrastructural Zone 753 rais (120 hectares)
COT was responsible for the survey, design, and construction supervision of an HDPE PN 6.3 pipeline system including cast iron fitting material. The pipeline was approximately 2,000 m in length and 800 mm in diameter from starting point STA 126+190 to STA 128+190, parallel to the old pipeline.

SCOPE OF WORK
Survey and Design of Pipeline System
Construction Supervision

CONSTRUCTION COST
26.3 Million Baht (US$ 0.95 Million) (US$ 1 : 31.50 Baht)

DESIGN DURATION
February – May 2007